Mount Henry Bridge

Author

City of South Perth

Place Number

04794
There no heritage location found in the Google fusion table.

Location

across Canning River South Perth

Location Details

Local Government

South Perth

Region

Metropolitan

Construction Date

Constructed from 1982, Constructed from 2006 to 2007

Demolition Year

N/A

Statutory Heritage Listings

Type Status Date Documents More information
State Register Registered 16 Apr 2026 Register Entry
Assessment Documentation
Heritage Council

Heritage Council Decisions and Deliberations

Type Status Date Documents
(no listings)

Other Heritage Listings and Surveys

Type Status Date Grading/Management More information
Category Description
Local Heritage Survey Adopted 20 Dec 1994 Category A

Category A

Worthy of the highest level of protection and recommended for entry in the State Register

Statement of Significance

The following statement is largely drawn from the Heritage Council of Western Australia register entry for the inclusion of the Mount Henry Bridge in the State Register of Heritage Places.

Mount Henry Bridge is a nine-span, pre-stressed concrete road bridge, across the Canning River, built in 1982 and expanded in 2007. It carries three lanes of traffic in each direction, has a separate bicycle and pedestrian bridge cantilevered on both sides immediately below the traffic bridge, and two railway lines travelling in opposite directions.

The place has cultural heritage significance for the following reasons:
1. The place is associated with the growth of the Perth
metropolitan area in the latter part of the 20th century, and
government support for extensive road systems, and later rail
systems, commencing with the 1955 Stephenson-Hepburn
Plan and the subsequent 1963 Metropolitan Region Scheme.
(Factor A)
2. The place is a vital component of the Kwinana Freeway, a major
transport artery linking the Perth CBD with the south
metropolitan region of Perth, (including the industrial precinct
around Kwinana), and the major tourist and wine-growing
regions of the south-west of the state.
3. The place is representative of the significant concrete bridges
across major waterways that started emerging in Perth from the
1950s. (Factor A and D)
4. The place has aesthetic and scientific value for its innovative
design and construction including the cantilevered pedestrian
walkways and cycleways under the bridge deck on each side
which separates vehicle and pedestrian traffic, and the use of a
construction method which minimised the need for complex
and expensive mid-span temporary piers. The method of
construction demonstrates an engineering innovation not
previously used in Western Australia. (Factor H, B and G)
5. The place has social value as a prominent landmark that
contributes to the community’s sense of place. Its elegant and
simple form was designed to minimise the visual impact on the
river, allow maximum use by water traffic, and be well integrated
into the landscape. (Factor E and F)

Physical Description

The Mount Henry Bridge carries the Kwinana Freeway across the Canning River below the heights of
Mount Henry.

This bridge provides the Kwinana Freeway with a vital crossing of the Canning River, linking Perth with its
southern residential suburbs, the Kwinana industrial area, Mandurah and the Forrest Highway to the
southwest region.

In 1982 the Mount Henry Bridge was built to allow for the retention of a wide strip of foreshore with its
good spread of Nuytsia floribunda (Western Australian Christmas Tree) and the large and very old
paperbarks in that area. The design of the Mount Henry Bridge allowed for a separate bicycle and
pedestrian bridge to be cantilevered immediately below the traffic bridge.

The original bridge is of post-tensioned concrete. It has nine spans with a total length of 660 metres and a
deck width of 28.8 metres. In cross-section, it is a double box-section, with the upper deck carrying traffic
and cantilevers at the bottom of the box carrying pedestrian / cycle paths. The bridge was constructed
segmentally, using a balanced cantilever construction method. It carried three lanes of traffic in each
direction, with two pedestrian / cycle paths on cantilevers at the lower level. At 660 metres long, the
Mount Henry Bridge was the longest road bridge in Western Australia at the time it was built.

The 2005 additions to the Mount Henry Bridge referred to Mount Henry Bridge 2 were constructed using
an incremental launching technique, where 25-metre long segments were hydraulically jacked out onto
piers from a casting bay on the southern embankment. The 26 reinforced segments were manufactured
on site, and the launch of each segment took about five hours, scheduled two weeks apart throughout
most of 2005. During construction, a combination of permanent and temporary piers were used. The
appearance of the new bridge was designed to match the original bridge, with nine spans, the main
navigation span at river level being 75 metres wide.

The Mount Henry Bridge 1 carries the southbound traffic and the Perth to Mandurah rail lines. Mount
Henry Bridge 2 carries the northbound traffic lanes.

History

Early history of the area

The Djarlgarro Beelier (Canning River) - ‘place of abundance’ - is of vital significance to the Whadjuk
people, formerly being a source of food, water, and resources. At the time of colonisation, two Whadjuk
(Noongar people of the Perth region) groups resided along the Canning River, the Beeloo and the Beelier.
The Whadjuk land south of the Swan River and west of the Canning River to the coast is Beelier land. The
land across the Canning River to the Helena River is Beeloo land. The Canning River was the border
between these two groups and provided a route from the coastal plain to the hinterlands. The lives of
Whadjuk Noongar people, and their connection to their traditional lands were severely compromised
through expansion of European settlement.

The Canning River has cultural heritage significance and is included on the Aboriginal Sites Register (ACH
3538).

Mount Henry Bridge 1 (1982)

The north-south freeway system was planned by Professor Gordon Stephenson and Mr John Alastair
Hepburn in 1955 in the Plan for the Metropolitan Region Perth, Perth and Fremantle, which was a plan to
guide the long-term development of post-war Perth. Following the completion in 1959 of the Narrows
Bridge, which had been planned independently of the Stephenson-Hepburn Plan, the remainder of the
Freeway plan was adopted by the WA State Parliament in 1963.

While the 1955 report had identified the location of the crossing of the Kwinana Freeway adjacent to
Mount Henry, the 1963 Metropolitan Region Scheme showed the location as being adjacent to Deep
Water Point.

In 1967, following an objection from the City of Melville and consideration by the State Government of
alternative crossing points, the location reverted to the Mount Henry side of the river, despite local
concern about the environmental effect that this would have on the unspoilt shoreline of Mount Henry.
Ultimately, in 1975, Parliament approved the Main Roads Western Australia’s (MRWA) recommendation
and the Metropolitan Region Scheme was amended to show the crossing on the eastern side at Mount
Henry. Stage 1 of the freeway extension resulted in the completion of the Canning Interchange in 1979.
The second stage of the project involved the construction of the Mount Henry Bridge and the extension of
the freeway to South Street.

The Mount Henry Bridge was designed and constructed in such a way as to retain the foreshore of Mount
Henry. The bridge was nearly twice the length of the Narrows Bridge, with separate pedestrian and cycle
paths cantilevered below the main traffic lanes of the bridge. The construction contractor was Clough,
and the project manager for Main Roads Western Australia was Geoff Smith. The official opening took
place on 9 May 1982 with Premier Ray O’Connor and City of South Perth Mayor, George Burnett, in
attendance.

The original 1982 bridge was one of the last major bridges in WA designed in-house by MRWA engineers.
Engineers in the Bridge Section of MRWA were given the opportunity to come up with preliminary designs.
Of the 13 submissions, nine were chosen for further development. The local authorities and Professor
Gordon Stephenson, who was the consultant architect for the project, ultimately decided on John Gilbert
Marsh’s design, which Stephenson later helped refine.

The contract to build Mount Henry Bridge 1 (1982) was won by J O Clough & Son, (in partnership with
Danish firm Christiani and Neilson), which proposed a new construction method that had not been used
previously in Western Australia.

Mount Henry Bridge 2 (2005)

In 2005, further construction work commenced on a second Mount Henry Bridge as part of the widening
of the Kwinana Freeway and to accommodate a two-way railway line. This was part of a new railway line
located between the opposing traffic lanes of the Kwinana Freeway; and extending from the Perth central
business district to Mandurah. The new 15 metre wide bridge was built to the west of the original Mount
Henry Bridge. It was designed to carry an additional three lanes of traffic, a break-down lane and a cycle
and walking path. The two bridges overlap but do not touch, appearing as one continuous structure. The
railway is accommodated on the western side of the original bridge.

The design team of the Mount Henry Bridge 2 (2005) comprised Wyche Consultants, GHD and Coffey
Geosciences with input from Parry and Rosenthal Architects. Although the original brief developed by
Main Roads was to widen the original bridge, the Leighton-led consortium provided an alternative solution
with just one new bridge on the western side. The new traffic bridge was opened to traffic in January 2006
and the southern suburbs railway commenced operation in 2007.

The project won high acclaim in the construction industry and was the recipient of the following:
 2006 National Master Builders Association of WA Award for Excellence in Construction
 2007 National Cement Concrete and Aggregates Australia (CCAA) Public Domain Commendation for Bridges
 2007 National CCAA Public Domain Commendation for Sustainable Design.

Integrity/Authenticity

High / High

Condition

Good

Associations

Name Type Year From Year To
John Gilbert Marsh Architect - -
GHD Pty Ltd Architect - -
Wyche Consulting Architect - -
Parry and Rosenthal Architects Architect - -

References

Ref ID No Ref Name Ref Source Ref Date
Florey, Cecil. "Peninsular City: A Social History of the City of South Perth" Angus and Robertson NSW 1995

Place Type

Other Built Type

Uses

Epoch General Specific
Original Use Transport\Communications Road: Bridge
Present Use Transport\Communications Road: Bridge

Construction Materials

Type General Specific
Other CONCRETE Other Concrete

Historic Themes

General Specific
Infrastructure Development Settlements & Services
TRANSPORT & COMMUNICATIONS Road transport
Infrastructure Transport and Communications

Creation Date

07 Jan 1997

Publish place record online (inHerit):

Approved

Last Update

10 Nov 2026

Disclaimer

This information is provided voluntarily as a public service. The information provided is made available in good faith and is derived from sources believed to be reliable and accurate. However, the information is provided solely on the basis that readers will be responsible for making their own assessment of the matters discussed herein and are advised to verify all relevant representations, statements and information.