Local Government
South Perth
Region
Metropolitan
across Canning River South Perth
South Perth
Metropolitan
Constructed from 1982, Constructed from 2006 to 2007
| Type | Status | Date | Documents |
|---|---|---|---|
| State Register | Registered | 16 Apr 2026 | HCWebsite.Listing+ListingDocument, HCWebsite.Listing+ListingDocument |
| Type | Status | Date | Documents |
|---|---|---|---|
| (no listings) |
| Type | Status | Date | Grading/Management | |
|---|---|---|---|---|
| Category | ||||
| Local Heritage Survey | Adopted | 20 Dec 1994 | Category A | |
The following statement is largely drawn from the Heritage Council of Western Australia register entry for the inclusion of the Mount Henry Bridge in the State Register of Heritage Places. Mount Henry Bridge is a nine-span, pre-stressed concrete road bridge, across the Canning River, built in 1982 and expanded in 2007. It carries three lanes of traffic in each direction, has a separate bicycle and pedestrian bridge cantilevered on both sides immediately below the traffic bridge, and two railway lines travelling in opposite directions. The place has cultural heritage significance for the following reasons: 1. The place is associated with the growth of the Perth metropolitan area in the latter part of the 20th century, and government support for extensive road systems, and later rail systems, commencing with the 1955 Stephenson-Hepburn Plan and the subsequent 1963 Metropolitan Region Scheme. (Factor A) 2. The place is a vital component of the Kwinana Freeway, a major transport artery linking the Perth CBD with the south metropolitan region of Perth, (including the industrial precinct around Kwinana), and the major tourist and wine-growing regions of the south-west of the state. 3. The place is representative of the significant concrete bridges across major waterways that started emerging in Perth from the 1950s. (Factor A and D) 4. The place has aesthetic and scientific value for its innovative design and construction including the cantilevered pedestrian walkways and cycleways under the bridge deck on each side which separates vehicle and pedestrian traffic, and the use of a construction method which minimised the need for complex and expensive mid-span temporary piers. The method of construction demonstrates an engineering innovation not previously used in Western Australia. (Factor H, B and G) 5. The place has social value as a prominent landmark that contributes to the community’s sense of place. Its elegant and simple form was designed to minimise the visual impact on the river, allow maximum use by water traffic, and be well integrated into the landscape. (Factor E and F)
The Mount Henry Bridge carries the Kwinana Freeway across the Canning River below the heights of Mount Henry. This bridge provides the Kwinana Freeway with a vital crossing of the Canning River, linking Perth with its southern residential suburbs, the Kwinana industrial area, Mandurah and the Forrest Highway to the southwest region. In 1982 the Mount Henry Bridge was built to allow for the retention of a wide strip of foreshore with its good spread of Nuytsia floribunda (Western Australian Christmas Tree) and the large and very old paperbarks in that area. The design of the Mount Henry Bridge allowed for a separate bicycle and pedestrian bridge to be cantilevered immediately below the traffic bridge. The original bridge is of post-tensioned concrete. It has nine spans with a total length of 660 metres and a deck width of 28.8 metres. In cross-section, it is a double box-section, with the upper deck carrying traffic and cantilevers at the bottom of the box carrying pedestrian / cycle paths. The bridge was constructed segmentally, using a balanced cantilever construction method. It carried three lanes of traffic in each direction, with two pedestrian / cycle paths on cantilevers at the lower level. At 660 metres long, the Mount Henry Bridge was the longest road bridge in Western Australia at the time it was built. The 2005 additions to the Mount Henry Bridge referred to Mount Henry Bridge 2 were constructed using an incremental launching technique, where 25-metre long segments were hydraulically jacked out onto piers from a casting bay on the southern embankment. The 26 reinforced segments were manufactured on site, and the launch of each segment took about five hours, scheduled two weeks apart throughout most of 2005. During construction, a combination of permanent and temporary piers were used. The appearance of the new bridge was designed to match the original bridge, with nine spans, the main navigation span at river level being 75 metres wide. The Mount Henry Bridge 1 carries the southbound traffic and the Perth to Mandurah rail lines. Mount Henry Bridge 2 carries the northbound traffic lanes.
Early history of the area The Djarlgarro Beelier (Canning River) - ‘place of abundance’ - is of vital significance to the Whadjuk people, formerly being a source of food, water, and resources. At the time of colonisation, two Whadjuk (Noongar people of the Perth region) groups resided along the Canning River, the Beeloo and the Beelier. The Whadjuk land south of the Swan River and west of the Canning River to the coast is Beelier land. The land across the Canning River to the Helena River is Beeloo land. The Canning River was the border between these two groups and provided a route from the coastal plain to the hinterlands. The lives of Whadjuk Noongar people, and their connection to their traditional lands were severely compromised through expansion of European settlement. The Canning River has cultural heritage significance and is included on the Aboriginal Sites Register (ACH 3538). Mount Henry Bridge 1 (1982) The north-south freeway system was planned by Professor Gordon Stephenson and Mr John Alastair Hepburn in 1955 in the Plan for the Metropolitan Region Perth, Perth and Fremantle, which was a plan to guide the long-term development of post-war Perth. Following the completion in 1959 of the Narrows Bridge, which had been planned independently of the Stephenson-Hepburn Plan, the remainder of the Freeway plan was adopted by the WA State Parliament in 1963. While the 1955 report had identified the location of the crossing of the Kwinana Freeway adjacent to Mount Henry, the 1963 Metropolitan Region Scheme showed the location as being adjacent to Deep Water Point. In 1967, following an objection from the City of Melville and consideration by the State Government of alternative crossing points, the location reverted to the Mount Henry side of the river, despite local concern about the environmental effect that this would have on the unspoilt shoreline of Mount Henry. Ultimately, in 1975, Parliament approved the Main Roads Western Australia’s (MRWA) recommendation and the Metropolitan Region Scheme was amended to show the crossing on the eastern side at Mount Henry. Stage 1 of the freeway extension resulted in the completion of the Canning Interchange in 1979. The second stage of the project involved the construction of the Mount Henry Bridge and the extension of the freeway to South Street. The Mount Henry Bridge was designed and constructed in such a way as to retain the foreshore of Mount Henry. The bridge was nearly twice the length of the Narrows Bridge, with separate pedestrian and cycle paths cantilevered below the main traffic lanes of the bridge. The construction contractor was Clough, and the project manager for Main Roads Western Australia was Geoff Smith. The official opening took place on 9 May 1982 with Premier Ray O’Connor and City of South Perth Mayor, George Burnett, in attendance. The original 1982 bridge was one of the last major bridges in WA designed in-house by MRWA engineers. Engineers in the Bridge Section of MRWA were given the opportunity to come up with preliminary designs. Of the 13 submissions, nine were chosen for further development. The local authorities and Professor Gordon Stephenson, who was the consultant architect for the project, ultimately decided on John Gilbert Marsh’s design, which Stephenson later helped refine. The contract to build Mount Henry Bridge 1 (1982) was won by J O Clough & Son, (in partnership with Danish firm Christiani and Neilson), which proposed a new construction method that had not been used previously in Western Australia. Mount Henry Bridge 2 (2005) In 2005, further construction work commenced on a second Mount Henry Bridge as part of the widening of the Kwinana Freeway and to accommodate a two-way railway line. This was part of a new railway line located between the opposing traffic lanes of the Kwinana Freeway; and extending from the Perth central business district to Mandurah. The new 15 metre wide bridge was built to the west of the original Mount Henry Bridge. It was designed to carry an additional three lanes of traffic, a break-down lane and a cycle and walking path. The two bridges overlap but do not touch, appearing as one continuous structure. The railway is accommodated on the western side of the original bridge. The design team of the Mount Henry Bridge 2 (2005) comprised Wyche Consultants, GHD and Coffey Geosciences with input from Parry and Rosenthal Architects. Although the original brief developed by Main Roads was to widen the original bridge, the Leighton-led consortium provided an alternative solution with just one new bridge on the western side. The new traffic bridge was opened to traffic in January 2006 and the southern suburbs railway commenced operation in 2007. The project won high acclaim in the construction industry and was the recipient of the following: 2006 National Master Builders Association of WA Award for Excellence in Construction 2007 National Cement Concrete and Aggregates Australia (CCAA) Public Domain Commendation for Bridges 2007 National CCAA Public Domain Commendation for Sustainable Design.
High / High
Good
| Name | Type | Year From | Year To |
|---|---|---|---|
| John Gilbert Marsh | Architect | - | - |
| GHD Pty Ltd | Architect | - | - |
| Wyche Consulting | Architect | - | - |
| Parry and Rosenthal Architects | Architect | - | - |
| Ref ID No | Ref Name | Ref Source | Ref Date |
|---|---|---|---|
| Florey, Cecil. "Peninsular City: A Social History of the City of South Perth" | Angus and Robertson NSW | 1995 |
Other Built Type
| Epoch | General | Specific |
|---|---|---|
| Original Use | Transport\Communications | Road: Bridge |
| Present Use | Transport\Communications | Road: Bridge |
| Type | General | Specific |
|---|---|---|
| Other | CONCRETE | Other Concrete |
| General | Specific |
|---|---|
| Infrastructure | Development Settlements & Services |
| TRANSPORT & COMMUNICATIONS | Road transport |
| Infrastructure | Transport and Communications |
This information is provided voluntarily as a public service. The information provided is made available in good faith and is derived from sources believed to be reliable and accurate. However, the information is provided solely on the basis that readers will be responsible for making their own assessment of the matters discussed herein and are advised to verify all relevant representations, statements and information.