Local Government
Vincent
Region
Metropolitan
11 Summers St East Perth
Vincent
Metropolitan
| Type | Status | Date | Documents | More information |
|---|---|---|---|---|
| State Register | Registered | 08 Jan 2016 |
Register Entry Assessment Documentation |
Heritage Council |
| Type | Status | Date | Documents |
|---|---|---|---|
| (no listings) |
| Type | Status | Date | Grading/Management | More information | |
|---|---|---|---|---|---|
| Category | Description | ||||
| Register of the National Estate | Indicative Place |
|
Heritage Council | ||
| Municipal Inventory | Adopted | 13 Mar 2001 |
|
Heritage Council | |
| Perth Draft Inventory 99-01 | YES | 31 Dec 1999 |
|
Heritage Council | |
| Classified by the National Trust | Classified | 10 Mar 1997 |
|
Heritage Council | |
| Art Deco Significant Bldg Survey | Completed | 30 Jun 1994 |
|
Heritage Council | |
Architectural/technical accomplishment
The dominant buildings 'A' and 'B' station and the frequency changer building, are good examples of utilitarian industrial structures in which aesthetic considerations have been taken into account but have not been an over-riding concern. The absence of any attempt to effectively integrate the 'A' and 'B' station buildings is indicative of this position. The Art Deco decoration of the 'B' station building and the balustrading associated with the external walkways and retaining walls are distinctive features which add to the character of the building and grounds. The interior spatial quality of the 'A' station turbine room is of considerable aesthetic quality and exhibits a high degree of unity of materials, design and form.
The former office and test room is enhanced by the garden development on the east side which is an integral component in the design. The Art Deco styling of this building contributes to the unity of the northern aspect of the complex as a whole and readily identifies the era of development. In combination the building and garden are considered to have some heritage significance for aesthetic values. The other buildings on the site are utilitarian in design and execution and are generally unexceptional from an architectural viewpoint.
The power station when considered as a whole contributes to the river landscape and has a landmark quality from particular viewpoints. Its importance as a dominant landmark has diminished in recent years, because of new development in the surrounding areas and as a result of the removal of the chimneys which were prominent identifying elements in the landscape.
Historical significance or develop ent of cultural phases; association with important figures
The power station has historic value for its role in the development of Western Australia and the metropolitan area in particular, its influence on the standard of living enjoyed by the community throughout the greater part of this century as the only public power station supplying the metropolitan area from 1916-1951 and after that date its role as part of the interconnected south-west electricity system are important; the power station complex represents the pioneering phase of the Western Australian electricity system and dates from the era when the industry world-wide was in a formative stage.
The power station has historic value for its close association with individuals whose activities have been significant in shaping the development of Western Australia. As a major public utility with a history spanning over most of this century, it was associated with people such as: John Scaddan MLA, Premier and Colonial Treasurer, whose term of office from October 1911 - July 1916, spanned the period when the power station was established; John Tregerthen Short, Commissioner for Railway s, 1908-1918; William Henry Taylor, General Manager Tramways & Electricity Supply; Charles Merz, Senior Partner Merz and McLellan, who was a pioneer in the field of electric power engineering with a world-wide reputation; and,
F.C. Edmondson, R.H.G. Clark, J.B. Jukes and J.B. Horrigan.
Demonstration of a way of life, custom, process of function
The collection of turbo-alternator sets (generator sets) which span a period of fo1ty years (including the No 3 set now located at the Energy Museum , Fremantle) represent the development of power generation technology over a significant period when progressively larger units were being developed. It is important as a reference site because the collection located as it is "under the one roof ' is probably unique as a demonstration of the development of the technology over this period and represents the growth of the system and the pioneering phase in electricity supply in Western Australia.
The power station complex is important in demonstrating the process of power generation , particularly in the first half of the 20th century. The power station buildings possess features which were typical of industrial buildings in general and power station buildings in particular in the period when they were built. The plant and equipment was generally current technology of a high standard at the time when it was installed.
Social significance
The power station complex is significant because of its influence on the industrial development of the State, particularly in the first half of the 20th century, and on the living standards of the community as a whole during this period in the metropolitan area in particular and in Western Australia generally.
As well as the contribution to the lifestyle and standard of living of the community in general the power station has social significance as the place of employment of a large workforce over a considerable period of time and this association would have importance for those individuals and for their families.
Scarcity value; aparticularly fine (or unique example)
The power station complex is important as the largest and only government operated electricity supply utility supplying the metropolitan area during the first half of the 20th century. It is likely that the power station complex contains the most comprehensive collection of steam turbine generating units in Austral ia which remain in-situ. It is one of a few such large scale utilities from the pre-World War One period still existing in Australia. The frequency changer set is unique in Australia, and rare in a world context.
The power station complex is one of adiminishing number of industrial sites remaining on the Swan River foreshore. Its location and use of the river resource in the power generation process is representative of a tradition which is no longer generally approved or practised. It is also one of an equally diminishing number of industrial sites which remain as historical evidence of the former East Perth industrial district
The power station at East Perth has been described as "three power stations in one"; 'A', 'B', and 'C' stations established over a forty year period from World War One to the m id-l 950s. 'A' station commenced generation in 1916, and was expanded in 1922 and 1928; 'B' station was commissioned in 1938 and 'C' station in 1956.
Each stage reflected new developments in the field with more advanced plant and equipment and progressively larger generating units being installed. 'A' station with five generating units had a total capacity of 32 MW; 'B' and 'C' stations with one generating unit each had a capacity of 25 MW and 30 MW respectively. Some plant and equipment from each of the three stages of development remains in the bu ildings, although the degree of intactness is variable, with almost nothing remain ing in the boiler house and a large proportion of generating plant still in place in the turbine room. The collection of plant and equipment wh ich remains represents a sequence of technologica l development which is in situ and has therefore an enhanced heritage value.
From an architectural viewpoint the power station could be more accurately described as two power stations in one, as it is essentially two buildings of distinct architectural styling abutting one another. The first building housing 'A' station, designed prior to World War One and extended in the mid- 1920s using the same construction; and 'B' station designed c.1934 with Art Deco decorative features. (Bl)
A levelled area where the main development was to occur was established at approximately 2 .7m above water level. For the initial development some 1,300 round janah piles were driven into the ground to a depth of 1Om with a greater concentration of piles in the areas where heavy loads were to occur. The piles were then capped with a reinforced concrete foundation on which the main building was constructed. The same method was used for extensions to the building carried out in the mid-l 920s and mid- l 930s. In excess of 2,000 piles were used in all. The piling work and foundation raft were undertaken by the Railways Department using local expertise and manpower, in readiness for the British contractors who were responsible for the construction of the building and installation of plant.
There was no new building as such associated with 'C' station, which was accommodated within the original building, with some modifications to the structure and rem oval of plant and equipment, including some of the oldest boilers and generating sets, which were then obsolete. The free standing frequency changer building (B16), designed in the 1940s, is similar to the 1930s structure in general form and detailing but without the Art Deco decoration. The buildings likewise demonstrate a developmental sequence of architectural design and building construction which can be seen in juxtaposi tion. The size and expansion of the power station, represented in the physical fabric, is also a measure of the scale and growth of the metropolitan area particularly in the inter-war period.
As well as the central power station building which contained the boiler house, turbine room, switch house and pump house, there were various ancillary buildings associated with each stage.
These buildings were added to, modified, and used for different functions as the station expanded, to prolong their life and in response to new technological developments. In the period following World War Two many additional workshop buildings and other ancillary structures were constructed, however some from the earliest period of development remained in use throughout the working life of the power station and still exist on the site.
Drawings exist showing the development of the power station site and the buildings and other features associated with each stage.
The power station buildings were essentially functional, their purpose being to house plant and equipment which had specific spatial and operational requirements. The form and organisation of the buildings generally reflected these requirements and were an expression, albeit unconscious, of the functions they housed. Architectural considerations, while not neglected, were not the primary concern. The plant and buildings, and their organisation on the site, were an integrated system and have their greatest meaning as such.
When new, the 'A', 'B' and 'C' stations were modem, up-to-date operations, comparing favourably in efficiency with power stations of a similar and sometimes greater size overseas. Most of the plant and equipment was manufactured in Britain, although initial contracts for switch gear had been let with the German firm, Allegemeine Elektricitats Gesellschaft (A.E.G.) and the alternators in the original generating sets were made by the Swiss firm Brown Boveri. The dominance of British contractors, brought about in part by the advent of the First World War, was evident in all stages of the power station development. In 1916 when the first stage of the power station was nearing completion it was reputed to have been one of the largest in Australia.
In general, the buildings were unpretentious, straightforward, economical and stylistically of their time. 'A' station building was designed to allow for extensions and its north elevation was never more than a temporary solution, with wall cladding of corrugated iron sheets. The main elevation on the south, which paradoxically faced the railway line and the undeveloped portion of the site, incorporated classical details whkh were a feature of late 19th and early 20th century public buildings in Australia and elsewhere. The 'B' station building, which abutted 'A' station on the north, was designed c.1934, with an unrelated constructional system and the Art Deco detailing of the 1920s and 1930s. 'B' station is in effect the public face of the power station seen from the entrance on Summers Street and is probably the image which is best known. Both stages were designed to reflect the status of the power station as an important, up-to date government utility, built with the aim of advancing the development of the state, and enhancing its image as a progressive economy.
The 'A' station building was designed in England either by the engineering consultants, Merz and McLellan or the contractor Babcock and Wilcox, who supplied and constructed the steelwork for the buildings and boilers. Working drawings bear the names of both firms. The mid- I920s extensions were built using the same constructional system and by the same overseas contractors. Most of the building materials were imported including Portland cement, which was not produced locally until the early 1920s. The 1930s buildings may have been designed in Perth although this is not absolutely clear.
Construction drawings for steel frame windows and sashes, and for the reinforced concrete bu ilding structure were prepared by the Structural Engineering Co of WA Ltd of Welshpool.
Drawings for the plant produced by the London contractors International Combustion Ltd also show details of the building design. Department files which could clarify the issue, have not been located and it is thought may no longer exist.
The two jetties which extended into the river a distance of approximately 45m were associated with the circulating water system . No. 1 jetty nearest the railway line, was constructed as part of the initial building works. No. 2 jetty was constructed in the early 1920s in association with the fust extension of the station when the No. 4 generator set was installed. Water was pumped from the river at the intakes located at the jetty heads, passing through the primary band screens to remove debris, jelly fish and other matter, before being circulated through the condensing plant within the power station building where it cooled steam in the condensers. Heated water was then conveyed across the site and discharged back into the river at a point further downstream near to the Bunbury railway bridge.
The jetty beads were surrounded by wire fencing for protection from debris such as floating Jogs brought down stream during flood conditions. There was also heavy algae growth caused by the sewerage settling ponds on Burswood Island in the early years of the station's operation and in an attempt to combat the fouling of the screens a barrier fence was constructed in front of the jetties along the length of the power station site.
When the foreshore area was reclaimed in the 1950s the jetties were truncated and became less prominent features on the river edge. No. 1 jetty no longer exists. The No. 2 jetty head, but none of the equipment, remains and is now used as a public facility associated with the riverside recreational open space.
Assessment 1997
Construction 1914
The following documentary evidence is extracted from the Conservation Plan which provides a full account with references of the documentary evidence available at that time.
The land was acquired by the government in March 1912, when 27 acres (l lha) were resumed for the purpose of additions and improvements to the Eastern Railway. Prior to the government' s purchase there had been a succession of owners; Alfred Hawes Stone and his family from (1830-1886); Perth bank manager Robert Edmund Alfred Wilkinson (1886-1893); and widow Emily Smith of Parramatta, NSW ( 1893-1912). The 2 acre (0.8ha) portion of the adjoining Location 2, resumed at the same time as Location 3, was part of a residential subdivision which included a row of modest cottages fronting onto Tamar Street, two of which were located on the future power station site.
The East Perth site met the basic requirements for the location of a large centralised power station in the metropolitan area, in that it could be readily serviced by rail for delivery of local coal from Collie (and imported coal from NSW); it was close to an economical supply of cooling water for the condensing plant; and it was centrally located within the distribution area, which initially extended from Midland Junction to Fremantle. Jn addition the government owned the land, whether it was resumed with the power station in mind is not clear, as the transaction had been concluded some time before the purchase of the tramways company or the recommendations had been made for the power station. In the event, the power station was to occupy only the eastern half of the total area resumed which overall extended from the river to East Parade (formerly Jewell Street).
In May 1912, the State government led by the newly elected Labor Premier John Scaddan reached an agreement with Perth Electric Tramways Limited for the purchase of the company's assets and business. The acquisition of Perth's privately operated tramway system, which came at a time when the Scaddan Government was embarking on a program of state socialism and the establishment of a number of state owned enterprises, was ratified later in the year in the Tramways Purchase Act, 1912. In the same year the Perth City Council purchased another private enterprise, the Perth Gas Company, which supplied both gas and electricity within the city area. Fremantle Council and some smaller local authorities also operated public electricity supply utilities and in the case of Fremantle also tramway services. While the Perth City Council and the government had acted independently , the joint requirements of the utilities they had acquired and the desire to increase the scale of both operations, led to the establishment of the East Perth Power Station and to the government undertaking the supply of electricity throughout the whole of the metropolitan area. At the time it was the first state government to undertake responsibility for a pubUc electricity utility.
Having acquired run-down and inadequate plant and infrastructure, the government and the council were faced with the immediate need to build new power stations to continue the running of their enterprises.
Both had plans for expansion, while the government, in addition to supplying its tramways and railway workshops at Midland Junction, had given some consideration to the electrification of the suburban railways and the line between Perth and Northam.
A further consideration was the desire to encourage the development of new industries, to create employment and overcome the dependency on the eastern states which resulted from Western Australia's small manufacturing sector.
All of which required the availability of a cheap electricity supply. The advice received by the government from the British power engineering consultants Merz and McLellan was to scrap the small scale systems then in existence and replace them with a centrally located power station of sufficient size to allow the production of electricity at an economical rate. The requirements of the government were insufficient to warrant a power station of such a size, as were those of the Perth City Council. The solution lay in the amalgamation of their joint interests, and agreement was reached whereby the government undertook responsibility for the supply of bu lk electricity to the council, who wou ld then retail to its own customers, with the council having exclusive rights to sales to the public and other local authorities within a five mile radius of the GPO.
Under these arrangements the Western Australian Government Electricity Supply was established, functioning initially within the umbrella of the Department of Government Railways and Tramways, and from the early 1920s, the Government Railways, Tramways and Electricity Supply.
The Government undertook to build the power station and an underground ring main in the city area, through which the high tension bulk current would be supplied to four new sub-stations to be provided by the council.
As well as supplying the tramways, railway workshops and other government instrumentalities, and the bulk sales to the Perth and Fremantle councils, the governm ent engaged in retail sales direct to consumers not covered by the municipal agreements. In the 1920s and 1930s it expanded the distribution system throughout the metropolitan area and beyond, eastward into the hills districts and south of Arrnadale. These various arrangements continued until the end of World War Two when in 1946 the State Electricity Commission of Western Australia came into being taking over responsibility for the government's electricity undertakings. The Commission purchased the City of Perth Electricity and Gas Department as a going concern in December 1948, the Fremantle Municipal Tramways and Electric Lighting Board in June 1952, and Claremont, South Perth and Subiaco undertakings in the same year, eventually assuming control of the various independent small operations in country regions, to develop the integrated state-wide system as it exists today.
With one supply system there came a degree of standardisation , where this had not previously existed. The Perth system, designed by Merz and McLellan, utilised the latest technology and technical expertise and was comparable with contemporary developments elsewhere in Australia and overseas. One important difference was the adoption of 40 cycle (40 Hz) frequency. At the time frequencies in use around the world ranged from 25 to I 00 cycles depending on whether the main use was for motive power or lighting. For general use the 40 cycle frequency was a comprom ise which Merz and McLellan had found was satisfactory elsewhere.
When the decision was made to build a new power station at South Fremantle with a greater capacity than that of East Perth, the question of continuing with 40 cycle frequency came under scrutiny. By the early 1940s it was non-standard in Australia as well as overseas. In England, and on tbe east coast of Australia the standard was 50 cycles, in the USA 60 cycles.
Advice to the government was strongly in favour of adopting the 50 cycle frequency although as with the initial decision agreement was not universal, particularly as the cost of converting all existing electrical equipment and appliances to operate on the higher frequency entailed a huge cost well beyond the resources of the State. A frequency changer unit was installed at East Pe1th to allow the two stations to operate in conjunction in supplying the metropolitan area. A special building (B 16) to house the frequency changer, designed in the same mode as the power station at South Fremantle, was constmcted on the north side of the main building at East Perth, the work being carried out simultaneously with that at South Fremantle. This frequency changer unit is a distinctive feature of the East Perth Power Station and is possibly unique in Australia.
All metropolitan supplies were generated at the East Perth Power Station until 1951, when the power station at South Fremantle came on load. The last expansion at East Perth was in 1955 when the No. 7 generating unit was installed and the coal handling plant was modern ised. With the development of the south-west grid and the establishment of power stations at Bunbury , Kwinana and Muja and the take-over and expansion of Collie power station, the importance of East Perth in the system progressively declined. 1t remained an important contributor in the system until the late 1960s after wh ich its main use was for standby and peak load winter conditions.
From the 1950s on, the East Perth station progressively assumed the function of a centralised equipment service centre for the Commission's state-wide operations which necessitated the expansion of workshop facilities. As well as the maintenance and repair services another aspect of the station's so-called "export" work was the sale of steam, transported by underground mains, to Royal Perth Hospital and the SEC gas works in Trafalgar Road. In 1973 the Power System Control Centre (B38) was commissioned, replacing the former control centre located in 'B' station. The system control centre was another of the centralised functions located at East Perth, regulating power generation at the various power stations in the interconnected system and directing the transmission of power through the south-west grid. The generation of power ceased at the East Perth station on 24 December 1981 bringing to an end sixty five years of continuous operation.
Other functions maintained at the East Perth site during the 1980s have recently been phased out including the system control centre, leaving almost all buildings unoccupied and in a deteriorating condition. Numerous smaller ancillary structures have been removed as well as quantities of equipment and the distinctive chimneys. A program to eliminate all asbestos insulation associated with the plant and equipment has resulted in the removal of most of the boiler house plant and piping associated with the generating plant. The chemical laboratory and water treatment plant facilities on the site continue in use. The station site remains a part of Western Power's operations and an integrated component in the state grid through the 66 kV and 132 kV switchyards.
| Library Id | Title | Medium | Year Of Publication |
|---|---|---|---|
| 3138 | East Perth Power Station : Proposed Site Redevelopment - a Proposal to Refurbish and Modify a Heritage Power Station Complex to Create a Science and Technology Centre | Heritage Study {Other} | 1997 |
| 7166 | East Perth power station : a vision for the East perth Power Station : draft masterplan for community consultation. | Report | 2004 |
| 5234 | The East Perth Industrial Heritage Centre : East Perth Power Station redevelopment proposal : presentation, 19 September 2001 / National Trust of Australia (W.A.) | Report | 2001 |
| 9935 | Electricity generation, transmission and distribution in Western Australia: representation on the register of heritage places. | Report | 2007 |
| 2400 | Industrial heritage schools competition 1990. | Report | 1990 |
| 12073 | East Perth Power Station - unfixed plant, equipment & furnishing. Heritage review of stored items. | Heritage Study {Other} | 2024 |
| 8666 | East Perth Power Station : Constructed Asset Assessment Report. (CAA) | Report | 2004 |
| 11783 | East Perth Power Station machinery inventory | Electronic | 2019 |
| 341 | From sailing ships to microchips : inaugural industrial heritage conference. Fremantle 15-16 June 1994. | Conference proceedings | 1994 |
| 11782 | East Perth Power Station Interpretation Strategy | Electronic | 2019 |
| 12023 | Walter's Brook Pump House archival record and significant fabric analysis: encompassing the Walter's Brook Pump House, pipework, equipment and associated contextual infrastructure at the East Perth Power Station (Place No 03318) | Archival Record | 2023 |
| 6885 | East Perth Power station Building B14, Laboratory fit-out : archival record. | Archival Record | 2004 |
| 410 | East Perth Power Station Conservation Plan vol 2: Illustrations, photographs, drawings, appendices - prepared for the East Perth Redevelopment Authority and State Energy Commission of Western Australia | Heritage Study {Cons'n Plan} | 1993 |
| 9531 | Swan and Helena rivers management framework: heritage audit and statement of significance, final report 26 February 2009. | Heritage Study {Other} | 2009 |
| 9844 | East Perth Power Station proposed site redevelopment. A proposal to refurbish and modify a heritage power station complex to create a science and technology centre. | Report | 1997 |
| 4934 | East Perth power station : government heritage property disposal report / Western Power Corporation. | Report | 2000 |
| 3211 | East Perth Power Station : proposed site redevelopment. | Report | 1997 |
| 7172 | East Perth Power Station skillion roofed extension to Blacksmith Shop & Store Building No.'s B2 and B22 : photographic archival record. | Archival Record | 2004 |
| 8664 | The urban studio: proposals for the East Perth power Station speculations in high density living. | Report | 2005 |
| 261 | A brief history of the development of East Perth power station The Institution of Engineers-Western Australian Division | Heritage Study {Other} | 1982 |
| 7174 | East Perth Power Station Walter's Brook Pump House Building No. B9 : photographic archival record. | Archival Record | 2004 |
| 8519 | First light: The development of a State Government Electricity and Gas supply. Part one. | Book | 0 |
| 7089 | East Perth Power Station : archival records for B38 and ancillary structures. | C D Rom | 2004 |
| 411 | East Perth Power Station Conservation Plan vol 3: Prepared for the East Perth Redevelopment Authority and State Energy Commission of Western Australia | Heritage Study {Cons'n Plan} | 1994 |
| 3210 | Scitech Discovery Centre and the East Perth Power Station - a Vision for the Future and a Link with the Past. | Report | 1997 |
| 272 | A brief history of the development of East Perth Power Station. | Heritage Study {Other} | 1981 |
| 7306 | East Perth power station precinct (draft masterplan). | Report | 2004 |
| 7313 | East Perth Power Station : Building B38, Power System Control Centre Building : photographic archival record. | Archival Record | 2004 |
| 7175 | East Perth Power Station Lift within 'A' Station Building No. B1 : photographic archival record. | Archival Record | 2004 |
| 11781 | East Perth Power Station conservation mangagement plan | Electronic | 2019 |
| 4565 | Report on East Perth Power Station : prepared for Western Power Corporation | Report | 1998 |
| 5966 | East Perth Power Station : archival documentary, 30 July 1997. | Video | 1997 |
| 7380 | East Perth Power Station : conservation issues - post inspection report. | Heritage Study {Other} | 2002 |
| 6532 | Western Australian endangered places 2003. | Kit | 2003 |
| 8665 | East Perth Power Station : building asset stabilisation report. (BAS) | Report | 2004 |
| 7173 | East Perth Power Station Metallurgical Laboratory Building No.'s B15 and B34 : photographic archival record. | Archival Record | 2004 |
| 10010 | Powering Perth; a history of the East Perth Power Station. | Book | 2011 |
| 260 | East Perth power station : heritage significance asessment report. | Heritage Study {Other} | 1992 |
| 7171 | East Perth Power Station Gatehouse Building No. B14 : photographic archival record. | Archival Record | 2004 |
| 7314 | East Perth Power Station : Coal Sample Storage Shed, 2 No. Concrete Water Tanks, Demineralising Water Treatment Plant House, Buildings 27 & 35 : photographic archival record. | Archival Record | 2004 |
| 12022 | Coal Tippler: Archival record and significant fabric analysis encompassing the coal tippler, coal tunnel and associated embankment at the East Perth Power Station (Place No. 03318) | Archival Record | 2023 |
| 9530 | Swan and Helena rivers regional recreational path development plan. | Report | 2009 |
| 409 | East Perth Power Station Conservation Plan vol 1: Prepared for the East Perth Redevelopment Authority and State Energy Commission of Western Australia | Heritage Study {Cons'n Plan} | 1993 |
| 6538 | East Perth Power Station. | Report | 2003 |
Individual Building or Group
| Epoch | General | Specific |
|---|---|---|
| Present Use | VACANT\UNUSED | Vacant\Unused |
| Original Use | GOVERNMENTAL | Power Station |
| Style |
|---|
| Inter-War Art Deco |
| Type | General | Specific |
|---|---|---|
| Wall | METAL | Steel |
| Roof | METAL | Corrugated Iron |
| Wall | BRICK | Common Brick |
| General | Specific |
|---|---|
| DEMOGRAPHIC SETTLEMENT & MOBILITY | Settlements |
This information is provided voluntarily as a public service. The information provided is made available in good faith and is derived from sources believed to be reliable and accurate. However, the information is provided solely on the basis that readers will be responsible for making their own assessment of the matters discussed herein and are advised to verify all relevant representations, statements and information.