Co-operative Bulk Handling Facility

Author

Shire of Woodanilling

Place Number

17197

Location

Great Southern Railway Woodanilling

Location Details

Local Government

Woodanilling

Region

Great Southern

Construction Date

Demolition Year

N/A

Statutory Heritage Listings

Type Status Date Documents
(no listings)

Heritage Council Decisions and Deliberations

Type Status Date Documents
(no listings)

Other Heritage Listings and Surveys

Type Status Date Grading/Management
Category
Municipal Inventory Adopted 18 Mar 2003 Category 4

Statement of Significance

The site is significant for its association with the Great Southern Railway and with the development of transport.

Physical Description

The facility is north of the Woodanilling Station and on the west side of the main Great Southern Railway. Loop lines connect it to this line. Upgrading of the base facility constructed in 1976 is ongoing with new sampling and weighbridges installed during the 1990's.

History

In 1940 Woodanilling farmers had their first opportunity to take advantage of bulk handling wheat. In that year a bin was built with a capacity of 51,000 bushels (1400 tonnes) and the harvest of 1940-41 saw 1245.66 tonnes delivered. Bulk handling was an idea that had been discussed among the district's farmers for more than 20 years. At the September meeting in 1919, the Woodanilling branch of the Farmers' and Settlers' Association moved that the Government bring in a bill to introduce the bulk handling of grain as the stacking of bags was labour intensive and costly. In 1941-42 the deliveries were 2,218.53 tonnes, a figure that was not to be exceeded or even approached until the 1947-48 season. The mid forties saw several bad seasons culminating in the flood year of 1945 when only 394.16 tonnes of wheat were delivered from the harvest. Oats were received for the first time in the 1951-52 season and the following year two row and six row barley was accepted. This season saw the permanent roofing of the bulkhead. Two open bulkheads were erected in later years. In 1976 all these installations were demolished and the present 'A' type fixed machinery installation (capacity 17,600 tonnes) and open bulkhead (4,900 tonnes) were built. With this new installation the receival point at Boyerine was closed. The Boyerine bin had been built in 1959 with a capacity of 5,400 tonnes. A record receival figure was achieved in the 1978-79 season when a total of 24.209.9 tonnes were delivered. This comprised 12,519.69 tonnes of wheat, 9,126.83 tonnes of two row barley (both records) and 5,563.38 tonnes of oats. Two row barley supplanted the six row varieties entirely after the 1966-67 harvest and farmers began growing increasing acreages of the malting barley. The peak seasons for oat production were 1958-89, 1959-60 and 1965-66 when about 5500 tonnes were delivered from each harvest in the district.

References

Ref ID No Ref Name Ref Source Ref Date
John Bird, "Round Pool to Woodanilling" pp 213, 301 1985
Photos 10/1-10/14; Round Pool to Woodanilling ps 192-193 (wheat stacks) 1985

Creation Date

04 Nov 2004

Publish place record online (inHerit):

Approved

Last Update

01 Jan 2017

Disclaimer

This information is provided voluntarily as a public service. The information provided is made available in good faith and is derived from sources believed to be reliable and accurate. However, the information is provided solely on the basis that readers will be responsible for making their own assessment of the matters discussed herein and are advised to verify all relevant representations, statements and information.